Objectives
- Clarification of all technical and organizational issues will be examined to provide a well-structured base.
- Using the meta results, a concept of the entire emerging system must be developed, leading to a specification of the core SMART-WAY system.
- Technical issues must be addressed, beginning with an integration of geographic information system (GIS) data and real-time data from public transport companies.
- Analysis and corresponding of passenger-to-vehicle positioning data will be used to parallel the positions.
- Scenarios of possible re-scheduling situations, based on traffic disruption or personal factors, can be determined.
- Finally, a workshop containing all results from WP2 and 3 must be organized to form the basis for a discussion of all developers and experts.
- The workshop will provide current information to all project members, and assist in future decisions regarding upcoming tasks.
System and Meta Data Concept
- Create concept for SMART-WAY base with all interfaces
- All functional aspects must be collected
- Non-functional aspects must be identified and applied to the concept
- Separation of system into modules which supports the development process
- Define database to prevent future inconsistencies
- Development of integration concept into database
Integration of GIS and Real-Time Information Systems
- Main focus on integrating public transport data into SMART-WAY systems
- Possible implementations studied and analyzed
- Design of interface connecting to GIS
- Timetable data stations matched against GIS data from traffic management systems
- Organizational structures will be developed for passenger recognition
Navigation Scenarios and Vehicle-Passenger Matching
- Identification of passenger scenarios to prevent potential complications
- Conducted analysis of passenger, vehicle, and real-time data positions from public transport data
- Strategies involving the possibilities of this analysis
- Scenarios discussed and documented in respect to the simulation model of WP 6
Workshop with Experts and Developers
- Discussion involving results from WP 2 and 3
- Final documentation containing decisions for further progression
- Essential for implementation in WP 4